The main riser was planned to be insulated with pre fabricated insulation pieces Ing. Paez (in charge on installation and supervisor of HVAC group) decided to insulate the 12” pipes with Thermasheet, also the derivation to 4” with 2" insulation
Transición de acero a PB con bridas, como se muestra en la fotografía.
The transition from steel to PB pipes.